M7/M8 Motorway

Complete Survey Solutions was involved in the M7/M8 motorway which was a joint Venture (PJV), which was acquired by BAM.

We had a survey crew involved in the setting out of the motorway, volume surveys & as built surveys through out the duration of the project. It was an exciting and challenging project and was opened ahead of schedule on the 28 May 2010 & cost €491 million euro to construct

Leave a Reply

Your email address will not be published. Required fields are marked *